The Weight Room Addition project at Central Methodist University is an approximate 10,000 square foot addition to Puckett Fieldhouse. The site was mostly level but both the East and West sides were steeply sloped and required the building footprint to adjust to these limitations. The building HVAC system is a closed-loop ground source type system – the first for the campus. To help reduce energy costs for lighting, the interior corridors have skylights for natural daylighting. The building massing expresses the difference in the volume of interior spaces between the large volume weight room and the lower volume offices and meeting rooms. The project includes a 5,000 square foot weight room, coach’s offices, two meeting rooms, new public restrooms, and the addition of HVAC to the second level of the existing building.
Location:
Fayette, Missouri
Project Type:
Sports Facility, Higher Education Facility
Size:
8,940 SF
Construction Cost:
$1.48 million
Completed:
May 2009
Facility Highlights:
- Closed-loop ground source HVAC system
- Natural daylighting
- Weight room
- Offices and meeting rooms.
- Coaches offices
- Two meeting rooms
- Public restrooms
The Weight Room Addition project at Central Methodist University is an approximate 10,000 square foot addition to Puckett Fieldhouse. The site was mostly level but both the East and West sides were steeply sloped and required the building footprint to adjust to these limitations. The building HVAC system is a closed-loop ground source type system – the first for the campus. To help reduce energy costs for lighting, the interior corridors have skylights for natural daylighting. The building massing expresses the difference in the volume of interior spaces between the large volume weight room and the lower volume offices and meeting rooms. The project includes a 5,000 square foot weight room, coach’s offices, two meeting rooms, new public restrooms, and the addition of HVAC to the second level of the existing building.
Location:
Fayette, Missouri
Project Type:
Sports Facility, Higher Education Facility
Size:
8,940 SF
Construction Cost:
$1.48 million
Completed:
May 2009
Facility Highlights:
- Closed-loop ground source HVAC system
- Natural daylighting
- Weight room
- Offices and meeting rooms.
- Coaches offices
- Two meeting rooms
- Public restrooms
Location:
Fayette, Missouri
Project Type:
Sports Facility, Higher Education Facility
Size:
8,940 SF
Construction Cost:
$1.48 million
Completed:
May 2009
Facility Highlights:
- Closed-loop ground source HVAC system
- Natural daylighting
- Weight room
- Offices and meeting rooms.
- Coaches offices
- Two meeting rooms
- Public restrooms
The Weight Room Addition project at Central Methodist University is an approximate 10,000 square foot addition to Puckett Fieldhouse. The site was mostly level but both the East and West sides were steeply sloped and required the building footprint to adjust to these limitations. The building HVAC system is a closed-loop ground source type system – the first for the campus. To help reduce energy costs for lighting, the interior corridors have skylights for natural daylighting. The building massing expresses the difference in the volume of interior spaces between the large volume weight room and the lower volume offices and meeting rooms. The project includes a 5,000 square foot weight room, coach’s offices, two meeting rooms, new public restrooms, and the addition of HVAC to the second level of the existing building.