Fire Station No. 2

Sni Valley Fire Protection District

PWA worked in a Design-Build arrangement with KAT Excavation for the Sni-Valley Fire Protection District. The project, located in Bates City, Missouri, replaced their existing station #2, which did not adequately serve the district’s needs. The new station comprises 6,168-SF, single-story slab-on-grade pre-engineered steel structure, with stone veneer and metal siding. The station has 5 sleeping rooms, a day room, a kitchen, a weight room, a Captains’ office, a work room, and restrooms in the living space. The apparatus bay consists of 2 double-deep bays, set up to accommodate future overhead doors at the back of the bay for a drive-through. The decontamination room and one restroom with a shower double as a storm shelter.

Facility Highlights:

  • Captain’s office
  • Office
  • Work room
  • Day room
  • Kitchen
  • Fitness room
  • 2 double-deep apparatus bays with support spaces
  • 5 sleep quarters for men and women
  • Men and Women restrooms
  • Decontamination/Shelter room
  • Future expansion capabilities

Location:

Bates City, Missouri

Project Type:

Public Safety Facility, Emergency Services, Design-build

Size:

6,168 SF

Completed:

October 2024

Construction Cost:

$2.5 million