Johnston Fieldhouse Renovation
Boonville Parks & Recreation
Johnston Field House, formerly a part of the Kemper Military School, is currently home to the Mid MO YMCA and contains a cardio theater, weight room, aerobics room, 25-yard indoor pool, indoor batting cage, office space, and 3 basketball courts.
The renovation projects put a new face on the historic 54,000 square foot Johnston Field House by not only improving the building from an aesthetic standpoint but also offering advantages for the building and the community such as environmental comfort through a reduction in infiltration, heat gain and humidity; enhanced air quality in the facility; energy efficiency; enhanced natural lighting within the building; noise reduction from the exterior; and abatement of most maintenance concerns due to water and air infiltration.
PWA provided design services through construction administration for window replacement, HVAC renovations, pool floor replacement, interior accessibility renovations, window replacement in the pool area, and roof replacement.
Johnston Fieldhouse Building Report Addressed the following issues:
- Window replacement -The existing windows were steel frame construction with leaking and infiltration a constant problem. PWA worked directly with the Boonville Historic Committee, the Missouri Department of Natural Resources, and the Boonville Park Board to determine the appropriate response and criteria for window replacement and to make recommendations.
- Accessibility (ADA) – The Field House had one accessible entrance to the south. The study focused on general accessibility requirements for the facility, specifically those for making the weight-training area accessible. The study made recommendations regarding a future elevator at the northeast corner of the building.
- HVAC systems – Upgrades to the existing systems were planned. The study focused on recommendations for the new HVAC system on the upper level and the feasibility of reusing the existing systems in the lower-level social center.
- Existing Pool- The existing pool was in need of some minor upgrades. The roof trusses were rusted and needed refinishing, and a dehumidification system was considered for the pool area.
- North Entry- The entry/stair tower on the Northside of the building had some problems with water infiltration, due to roof leaks and foundation drainage issues. The project team addressed roofing system replacement, gutter and downspout repair and replacement, and poor site drainage conditions along the Northside of the building.
- Structural Evaluation- The structure was evaluated from a general perspective, and more specifically for the feasibility of a future walking track above the basketball courts.
- General- Since no current drawings of the building were available, PWA prepared as-built drawings.
Location:
Boonville, Missouri
Project Type:
Sports and Recreation Facility
Size:
54,000 SF
Completed:
December 2006
Construction Cost:
$400,000
Project Website:
https://midmoymca.org/