Boonville Lions Park Aquatic Center

City of Boonville, Missouri

The Boonville Lions Park Aquatic Center was a team effort between PWArchitects, Counsilman-Hunsaker, and the City of Boonville.  PWA completed a feasibility study that was a comprehensive, preparatory analysis focusing on a potential swimming pool facility. The community considered several options and then hired PWA and Counsilman-Hunsaker to develop the design for an outdoor leisure pool with a concession building, bathhouse, shading canopies, and a pump house. The aquatic center opened in May of 2011.

Design Team Members:
McClure Engineering Co. (formerly THHinc.)
Counsilman-Hunsaker
Meco Engineering
Contractor: GBH Builders, Inc.

Location:

Boonville, Missouri

Project Type:

Aquatic Facility

Size:

2,300 SF bathhouse; 1,350 SF concessions; 1,860 SF pump house

Completed:

2010

Construction Cost:

$3.35 million