Cedar Ridge Elementary School

Columbia Public Schools

Students at Cedar Ridge Elementary School have a new home – one that has multiple sets of bathrooms, a cafeteria with a commercial kitchen, and playgrounds. What it doesn’t require are mobile classroom trailers. With more than five times the space of the previous Cedar Ridge Elementary School, the new school is just a mile and a half away.

As part of a 2014 bond election, District voters approved the $22 million building as part of CPS’s 10-year plan to address growth and overcrowding. As lead architect for the project, PWA worked with the district and consultants to finalize the design, which mirrors that of Eliot Battle and Beulah Ralph elementary schools. The new location has a capacity of 650 students but will start with about 450 in its first year.

The existing Cedar Ridge elementary school had been at overcapacity for several years and utilized seven trailers for classrooms and multipurpose areas. The 40-year-old building only had one set of bathrooms for students, and at any given time, there were usually more students in trailers than in the school building, according to the school’s principal, Angie Chandler.

Construction on the school began in the summer of 2016 and was completed in July of 2018.

Facility Highlights:

  • Classrooms
  • Library and media room
  • Cafeteria with a commercial kitchen and seating separate from the gymnasium
  • Fenced-in playground with a soft surface just for kindergartners.
  • Makerspace room, where students can integrate art with technology using various creative materials.
  • Teacher wellness room separate from the teacher’s lounge that focuses on mindfulness and provides teachers and faculty with a space to relax and de-stress.

Location:

Columbia, Missouri

Project Type:

Education Facility

Size:

89,796 SF

Completed:

July 2018

Construction Cost:

$17,888,931