Douglass High School Renovation
Columbia Public Schools
Douglass High School is Columbia Public Schools’ alternative high school, whose primary purpose is to engage at-risk students so they can complete high school and successfully transition into productive postsecondary occupations. The school, named for abolitionist Frederick Douglass, opened its doors around 1885 and served as the district’s all-black school until 1954. In 2012, CPS decided that the 100+-year-old school required a major renovation if it were to continue serving students’ needs. Their goal was to create a variety of effective learning environments at the school to meet the needs of students who function better in non-traditional settings.
In 2014, Columbia passed a $50 million bond issue to fund this and other projects throughout the district. In 2016, the building was closed for a year, and students relocated to a temporary space while construction crews gutted most of it and installed new electrical, heating, and air-conditioning systems, stair lifts, and flooring. The subsequent renovations added space and equipment for a culinary program and wood and metal shop, and stocked the physics and biology classrooms with new equipment and furniture. Because of the building’s age, the design and construction faced unexpected infrastructure challenges, including asbestos abatement. While most of the building’s interior is new, CPS opted to repair rather than replace some items with historical significance. Contractors worked around student artwork and repaired plaster walls and the building’s front steps.
Now that the renovation project is complete, CPS Superintendent Peter Stiepleman said, “The district sees Douglass High School as a place where students who struggle with a traditional school can be successful. The renovations will help the school accomplish that goal.”
Facility Highlights:
- All new finishes, including new lockers and flooring
- New HVAC system
- ADA accessibility
- New kitchen
- Computer labs
- Fire suppression system
- Laboratory science classrooms
- Practical Arts classrooms, including Culinary Arts
- Music classroom space
- New gym floor
- Masonry restoration, including new front steps
- New roofing
- New windows and doors
Location:
Columbia, Missouri
Project Type:
Education Facility
Size:
42,371 GSF
Completed:
September 2017
Construction Cost:
$5,406,927