Fr. Tolton Catholic High School began with aspirations to increase the private school options in the region. The Diocese of Jefferson City hired PWA (with M+H Architects) to develop a master plan and designs for this new Regional Catholic High School in Columbia, Missouri. Working closely with the Planning Committee to address goals for the academic curriculum and athletic programs, the team developed plans and renderings to raise funds for the estimated $16 million project.
A third-floor shell added to the building design will allow for future expansion and add the capability for two additional labs and seven additional general classrooms. With an average class size of 20 students, finishing this third-floor shell will allow the new school to accommodate a population of approximately 440 students.
The proposed plan for the building has two phases with Phase One, including the building, parking, and land development is complete. The second phase will add a third level to the building, athletic facilities, and additional parking spaces.
Project Details:
- The school entry opens into a commons area adjacent to the Chapel.
- The Administrative suite includes a conference room accommodating 8-10 people.
- The library on the second floor includes comfortable lounge chairs in the reading corner.
- A divider screen can be lowered from the ceiling, allowing separate events to occur simultaneously in the gymnasium.
- Classrooms are equipped with durable seating and overhead video equipment.
Location:
Columbia, Missouri
Project Type:
Catholic High School, K-12 Education
Size:
84,000 SF
Construction Cost:
$16 million
Completed:
Phase 1 – 2011
Facility URL:
Fr. Tolton Catholic High School
Facility Highlights:
- Chapel
- 6 General classrooms for the study of English, Foreign Language, Health, History, Math, Religion
- 1 Science lab/classroom
- 1 Art lab with office and storage
- 1 Media Center/Library
- 1 Virtual classroom
- 1 Business/computer labs
- 1 Band/Vocal music room with practice rooms in the music classroom
- Band Director and Vocal music teacher offices
- 1 Outdoor classroom
- Commons Area – Performing Arts Black Box Theatre
- Cafeteria/Kitchen
- 1 Gymnasium -1000-1200 seating capacity capable of holding practice courts with Coaches’ offices and P.E. teachers’ offices
- Two locker rooms
- Weight room
- Administrative office suite with a conference room for 8-10 people
- A parking lot for students and faculty with secure entry
- Counseling offices
- Outdoor activities complex to include facilities for Football/Soccer/Track/Baseball/Softball and an outdoor storage facility and concession stand.
Fr. Tolton Catholic High School began with aspirations to increase the private school options in the region. The Diocese of Jefferson City hired PWA (with M+H Architects) to develop a master plan and designs for this new Regional Catholic High School in Columbia, Missouri. Working closely with the Planning Committee to address goals for the academic curriculum and athletic programs, the team developed plans and renderings to raise funds for the estimated $16 million project.
A third-floor shell added to the building design will allow for future expansion and add the capability for two additional labs and seven additional general classrooms. With an average class size of 20 students, finishing this third-floor shell will allow the new school to accommodate a population of approximately 440 students.
The proposed plan for the building has two phases with Phase One, including the building, parking, and land development is complete. The second phase will add a third level to the building, athletic facilities, and additional parking spaces.
Project Details:
- The school entry opens into a commons area adjacent to the Chapel.
- The Administrative suite includes a conference room accommodating 8-10 people.
- The library on the second floor includes comfortable lounge chairs in the reading corner.
- A divider screen can be lowered from the ceiling, allowing separate events to occur simultaneously in the gymnasium.
- Classrooms are equipped with durable seating and overhead video equipment.
Location:
Columbia, Missouri
Project Type:
Catholic High School, K-12 Education
Size:
84,000 SF
Construction Cost:
$16 million
Completed:
Phase 1 – 2011
Facility URL:
Fr. Tolton Catholic High School
Facility Highlights:
- Chapel
- 6 General classrooms for the study of English, Foreign Language, Health, History, Math, Religion
- 1 Science lab/classroom
- 1 Art lab with office and storage
- 1 Media Center/Library
- 1 Virtual classroom
- 1 Business/computer labs
- 1 Band/Vocal music room with practice rooms in a music classroom
- Band Director and Vocal music teacher offices
- 1 Outdoor classroom
- Commons Area – Performing Arts Black Box Theatre
- Cafeteria/Kitchen
- 1 Gymnasium -1000-1200 seating capacity capable of holding practice courts with Coaches’ offices and P.E. teachers’ offices
- Two locker rooms
- Weight room
- Administrative office suite with a conference room for 8-10 people
- A parking lot for students and faculty with secure entry
- Counseling offices
- Outdoor activities complex to include facilities for Football/Soccer/Track/Baseball/Softball and an outdoor storage facility and concession stand.
Location:
Columbia, Missouri
Project Type:
Catholic High School, K-12 Education
Size:
84,000 SF
Construction Cost:
$16 million
Completed:
Phase 1 – 2011
Facility URL:
Fr. Tolton Catholic High School
Facility Highlights:
- Chapel
- 6 General classrooms for the study of English, Foreign Language, Health, History, Math, Religion
- 1 Science lab/classroom
- 1 Art lab with office and storage
- 1 Media Center/Library
- 1 Virtual classroom
- 1 Business/computer labs
- 1 Band/Vocal music room with practice rooms in a music classroom
- Band Director and Vocal music teacher offices
- 1 Outdoor classroom
- Commons Area – Performing Arts Black Box Theatre
- Cafeteria/Kitchen
- 1 Gymnasium -1000-1200 seating capacity capable of holding practice courts with Coaches’ offices and P.E. teachers’ offices
- Two locker rooms
- Weight room
- Administrative office suite with a conference room for 8-10 people
- A parking lot for students and faculty with secure entry
- Counseling offices
- Outdoor activities complex to include facilities for Football/Soccer/Track/Baseball/Softball and an outdoor storage facility and concession stand.
Fr. Tolton Catholic High School began with aspirations to increase the private school options in the region. The Diocese of Jefferson City hired PWA (with M+H Architects) to develop a master plan and designs for this new Regional Catholic High School in Columbia, Missouri. Working closely with the Planning Committee to address goals for the academic curriculum and athletic programs, the team developed plans and renderings to raise funds for the estimated $16 million project.
A third-floor shell added to the building design will allow for future expansion and add the capability for two additional labs and seven additional general classrooms. With an average class size of 20 students, finishing this third-floor shell will allow the new school to accommodate a population of approximately 440 students.
The proposed plan for the building has two phases with Phase One, including the building, parking, and land development is complete. The second phase will add a third level to the building, athletic facilities, and additional parking spaces.
Project Details:
- The school entry opens into a commons area adjacent to the Chapel.
- The Administrative suite includes a conference room accommodating 8-10 people.
- The library on the second floor includes comfortable lounge chairs in the reading corner.
- A divider screen can be lowered from the ceiling, allowing separate events to occur simultaneously in the gymnasium.
- Classrooms are equipped with durable seating and overhead video equipment.