Project Description

  • The site needed significant excavation in order provide for proper slope tolerances required for the movement and parking of fire trucks.
  • Entry to and exit from the site by Fire Department vehicles separates the critical traffic for department vehicles from the public lot.
  • Exterior materials used include fiber cement siding of two different colors and styles and brick veneer wainscoting. The roof is covered using architectural shingles.

Fire Station 9

City of Columbia, MO

Location:
Columbia, Missouri

Project Type:
Public Safety Facility, Emergency Services

Size:
7,891 sq. ft.

Construction Cost:
$1.6 million

Completed:
January 2010