The Boonville Lions Park Aquatic Center was a team effort between PWArchitects, Counsilman-Hunsaker, and the City of Boonville. PWA completed a feasibility study that was a preparatory, comprehensive study analysis focusing on a potential swimming pool facility. The community considered several options and then hired PWA and Counsilman-Hunsaker to develop the design for an outdoor leisure pool with a concession building, bathhouse, shading canopies, and a pump house. The aquatic center opened in May of 2011.
Design Team Members:
McClure Engineering Co. (formerly THHinc.)
Counsilman-Hunsaker
Meco Engineering
Contractor: GBH Builders, Inc.
Location:
Boonville, Missouri
Project Type:
Aquatic Facility
Size:
2,300 sq. ft. bathhouse; 1,350 sq. ft. concessions; 1,860 sq. ft. pump house
Construction Cost:
$3.35 million
Completed:
2010
Project URL:
Boonville Aquatic Center
The Boonville Lions Park Aquatic Center was a team effort between PWArchitects, Counsilman-Hunsaker, and the City of Boonville. PWA completed a feasibility study that was a preparatory, comprehensive study analysis focusing on a potential swimming pool facility. The community considered several options and then hired PWA and Counsilman-Hunsaker to develop the design for an outdoor leisure pool with a concession building, bathhouse, shading canopies, and a pump house. The aquatic center opened in May of 2011.
Design Team Members:
McClure Engineering Co. (formerly THHinc.)
Counsilman-Hunsaker
Meco Engineering
Contractor: GBH Builders, Inc.
Location:
Boonville, Missouri
Project Type:
Aquatic Facility
Size:
2,300 sq. ft. bathhouse; 1,350 sq. ft. concessions; 1,860 sq. ft. pump house
Construction Cost:
$3.35 million
Completed:
2010
Project URL:
Boonville Aquatic Center
The Boonville Lions Park Aquatic Center was a team effort between PWArchitects, Counsilman-Hunsaker, and the City of Boonville. PWA completed a feasibility study that was a preparatory, comprehensive study analysis focusing on a potential swimming pool facility. The community considered several options and then hired PWA and Counsilman-Hunsaker to develop the design for an outdoor leisure pool with a concession building, bathhouse, shading canopies, and a pump house. The aquatic center opened in May of 2011.
Design Team Members:
McClure Engineering Co. (formerly THHinc.)
Counsilman-Hunsaker
Meco Engineering
Contractor: GBH Builders, Inc.