Battle Elementary School – Columbia Public Schools

Battle Elementary School – Columbia Public Schools 2017-05-15T15:06:48+00:00

Project Description

Location:
Columbia, Missouri

Project Type:
Elementary School Facility

Size:
77,000 sq. ft.

Construction Cost:
$13.5 million

Completed:
August 2015

Project URL:
Battle Elementary School

Facility Highlights:

  • Accommodates up to 450 students
  • A studio classroom with a one-way mirror for teachers in training to watch a “master teacher” at work.
  • Classrooms furnished with temperature-controlled computer storage cupboards for student laptops and iPads.
  • An energy-efficient heating/cooling system
  • Classroom lighting operated by sensors
  • 194 parking spaces
  • Playgrounds
  • Stormwater facilities
  • Commercial kitchen.
  • Exterior of Battle Elementary School.
  • Entryway of Battle Elementary School.
  • This corridor at Battle Elementary School leads to the gym, media center, and computer lab.
  • Battle Elementary School Media Center
  • Battle Elementary School Media Center
  • Battle Elementary School Media Center
  • Battle Elementary School Media Center
  • Battle Elementary School Computer Lab
  • Gymnasium at Battle Elementary School.
  • Classroom at Battle Elementary School.
  • Hallway at Battle Elementary School
  • Wizard of Oz themed classroom at Battle Elementary School.
  • Hallway corridor at Battle Elementary School.
  • Battle Elementary School Art Classroom.
  • Battle Elementary School Music Room
  • Battle Elementary School Art Classroom.

As Columbia’s 20th elementary school, Battle Elementary School was developed in an effort to address overcrowding in other schools such as Two Mile Prairie and Alpha Hart Lewis, eliminate the need for trailer classrooms and reduce class sizes. Named for Dr. Eliot Franklin Battle, a Columbia educator and husband of Muriel Battle, the high school’s namesake, the school is located on a 30-acre site next to Muriel Battle High School on the northeast side of Columbia.

The 77,000 sq. ft. elementary school was financed by a $120 million bond issue in 2010, the same bond issue that funded the adjacent high school. The school’s groundbreaking was in October 2013 and construction was completed in August of 2015 at a construction cost of $13.5 million.

As lead architect for the project, PWA worked with ACI Frangkiser Hutchens and Columbia Public Schools throughout the design process. The process, which began in 2011, included programming, work sessions, spatial relationship diagrams, and schematic design through Construction Administration. The design of the school was a prototype for the building of future elementary schools including Beulah Ralph Elementary School in southwest Columbia and an additional school in southeast Columbia.

Please follow and like us: